Over the last few weeks, the Guild hallways have been re-plastered and repainted, a new boiler has been installed and the hall carpets have been replaced.
Share this post:
Over the last few weeks, the Guild hallways have been re-plastered and repainted, a new boiler has been installed and the hall carpets have been replaced.
Share this post: